Quality Assurance
For consistency of and adherence to quality control systems a quality manual is prepared and distributed to all persons concerned. This quality control Manual describes the system adopted at “SHRIJEE” for the Design, Manufacture, Assembly, Testing.
All raw materials are received with manufacturer's Test reports indicating the physical / chemical properties and other specific requirements as per the code. The test reports are verified for compliance with the code and purchase order. Random check tests are carried our and recorded on the goods received note.
In process Control
For in process control before start of manufacture, a quality plan is prepared for each job received and issued to all concerned.
Shop Instruction sheets give detailed instruction/ acceptance norms for the shop supervisors/ inspectors. Welding control is exercised as stipulated in the Quality Control Manual . Welding quality is very closely monitored by welding Engineers. All pressure parts joints are stamped by the welders for identification.
For any new process of manufacturing to be used, the process is tried out on mock-up. Manufacturing, Engineering and Quality Control set up the parameters for process before starting the job.
Field Assembly
Field Assembly meets quality Requirement as per technical requirements of the contract. The site QC Engineer supervises the Field Assembly/ Construction work for quality requirements.
All the welding is carried out in accordance with approved WPS by qualified welders. The site QC Engineer inspects the welding done at site.
Calibration of Measuring Instruments
All measuring instruments are calibrated using gauges/instruments whose accuracy is traceable to National standard. Pressure gauges are calibrated with the dead weight tester every three months.
Shipping Inspection
All products are checked by QC for painting, identification marking and proper protection and for compliance with special requirements of the contract if any.
Testing Facilities
“Shrijee” Test House has all the facilities that are needed to fulfill the codes requirements. Facilities for non-destructive testing, mechanical testing & chemical composition partially available at this shop and for remaining different outside agency have been employed.
Project Management
A full fledged Projects team handles the entire job once an order is placed; encompassing all the activities of Design, Procurement, Manufacture, Supply, Erection & Commissioning.
The project team has total strength of 10 engineers with a cumulative experience of 100 years I project Management with sophisticated project management techniques, including planning & Monitoring the projects team is well equipped to live up to its motto, which is “to complete the project in time, within the cost, and to customer Satisfaction”.
In fact once an order is placed, the project manager becomes the customer's single point contact for all his requirements and is identified as the company as far as the customer is concerned.
The projects team, in keeping with the company's philosophy of Total quality Management function as an extension of the customer, and is, for all practical Purposes, the custodian of the customers interests within the organization.
The team has worked in close coordination with all leading consultants in India as well as some abroad, and has won numerous bonuses from happy clients for projects Completed ahead of schedule.
We can undertake complete design, supply and installation of sugar plant ranging in capacity 1000 tons per day to 10,000 tons per day.
|